Intel’s 15th Gen Arrow Lake CPUs on track for mass production at 2nm in 2024
After the launch of the 1st generation Core Ultra, Intel began planning the next step in its race for “process leadership.” Sanjay Natarajan, SVP and director of Intel’s technology department, explained this in an interview with Nikkei. The 15th generation Arrow Lake processors are expected to succeed Meteor Lake in 2024, with the CPU tile … Continue reading Intel’s 15th Gen Arrow Lake CPUs on track for mass production at 2nm in 2024 More
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed